Category: News
IEG of World Bank Visited P&D Department For Evaluation of Food Secuirty Initiative
12th PDWP Meeting Held on 17th February 2026
PDWP meeting approves 42 development projects worth over Rs 140 billion
On the special instructions of Chief Minister Khyber Pakhtunkhwa Muhammad Sohail Khan Afridi, various projects worth over Rs 50 billion were approved in the health sector. Approval has been given to construct two hostels for male and female students in Bannu Medical College. A project to construct Cath Labs in various hospitals at a cost of Rs 19 billion has been approved to provide the best medical facilities to the citizens of Khyber Pakhtunkhwa based on the need.
A project to improve the district headquarters hospitals at a cost of Rs 7 billion has been approved in Khyber Pakhtunkhwa.
A project to increase the capacity of district headquarters hospitals to deal with any epidemic diseases in Khyber Pakhtunkhwa has been approved at a cost of Rs 8.75 billion.
A project to improve secondary health facilities in merged districts, including emergency units, has been approved.
A project of Rs 1 billion has been approved for the construction of flood protection works in Upper and Lower Dir. With the completion of the project, 583 acres of agricultural land, 25 civil irrigation channels and other infrastructure will be protected from floods, including floods, and 113,400 people will benefit from it.
The Marwat Canal System Phase 1 in Lakki Marwat has been approved at a cost of Rs 1 billion. The agricultural land of Bannu and Lakki Marwat will benefit from the said canal system. The canal system will provide water to 170,000 acres of land and the livelihood of the local population of these areas will improve.
Approval has been given to establish a Center of Excellence for special children affected by autism at the divisional level in Khyber Pakhtunkhwa.
The twelfth meeting of the Provincial Development Working Party was held under the chairmanship of Additional Chief Secretary, Planning and Development Department, Khyber Pakhtunkhwa, Lieutenant (Retd) Islam Zeb.
The meeting was attended by PDWP members and officers of the relevant departments. The forum approved 42 important projects related to MSD, sports, local government, social welfare, excise and taxation, and irrigation for the development of the province.
The approved projects include improvement of existing sump wells, pump house district-5(A) and improvement of Takkar Wah and Kot Hafeez districts in DI Khan district, construction of flood protection works in Upper and Lower Dir, feasibility study and detailed design of Gambella Lift Canal, rehabilitation of Marwat Canal System – Phase I, National Programme for Improvement and Laying of Waterways in erstwhile FATA, flood protection works in Tehsil Swabi, Topi and Lahore, improvement and construction of channels, drains, roads, bridges, causeways and installation of solar tube wells, construction of check dams and reservoirs in merged districts and construction of small dams in Baz Ali Small Dam District Kurram, Ningolai Swat in Khyber Pakhtunkhwa, PK-36 Mansehra, Chapra Rehana Haripur, Noor Di Rehana Haripur, Kotka Besakhel Bannu, Amangarh Nowshera, In-house feasibility studies for establishment and construction of BHUs in Namli Mira Abbottabad, Darwishabad Bakt Abbottabad, Mian Isa and Mira Akora Tehsil Jahangira Nowshera, Azakhel Bala Nowshera, Sharer Ahmed Wali Gai Domel Bannu, Mira Kachori Peshawar, Dil Bori Mansehra, Lodikhel Hangu, Shani Duba Torghar, Kalash Torghar, Elm Buner based on need, establishment of two hostels in Bannu Medical College, establishment of Cath Labs in various hospitals of the province based on need, redevelopment of non-teaching DHQs, strengthening of DHQ hospitals, strengthening of 12 DHQ hospitals, rehabilitation of secondary health facilities including improvement of accident and emergency units in newly merged districts, construction of buildings in Tehsil Haripur, Shabqadar, Charsadda and Bakkhail Bannu, feasibility of Tehsil Judicial Centers in 5 selected districts Studies and construction, procurement of equipment including scanners for Anti-Narcotics Control Unit, rehabilitation and solar powering of existing drinking water supply projects in Bajaur district under Khyber Pakhtunkhwa Rural Investment and Institutional Support Project, District Complex Ghalnai in Mohmand, Tehsil Complex in Safi area, Tehsil Complex in Kale area of Orakzai, Tehsil Complex Upper Kurram in Parachinar area of Kurram, Tehsil Complex in Sadda area of Kurram, District Complex in Parachinar area of Kurram, Tehsil Complex in Mir Ali, Tehsil Complex in Ghaljo area of Orakzai, DI Khan, FR, Sub-Division Dara Zinda, Tehsil Complex Razmak, Feasibility studies to explore the possibilities of wildlife conservation in Khyber district, Construction of drinking water supply and sanitation projects in the central districts of Khyber Pakhtunkhwa, Swabi, Mardan, Charsadda, Peshawar and Mansehra, various union councils of Abbottabad Kahal, Central Urban, Malikpura, Nawan Shahr-e- Water supply projects in Sheikhol Bandi, Kakol, Mirpur, Banda Pir Khan and Cantt area, Water supply project in Lora and Bakut area of Abbottabad, Water supply and sanitation project in Galiyat and Lora area of Abbottabad, Beautification and uplifting of several districts of Khyber Pakhtunkhwa including Chitral Lower, Chitral Upper, Swat, Dir Upper, Dir Lower, Malakand, Buner, Shangla, Kohistan Upper, Kohistan Lower, Battagram, Mansehra, Torgarh, Abbottabad, Kolai Palace and Haripur Kohat, Hangu, Karak, Bannu, Lakki Marwat, Tank and DI Khan, Swabi, Mardan, Charsadda, Peshawar and Nowshera, Improvement of infrastructure, monuments, street lights and green spaces under beautification and uplifting in merged districts including Swabi, Mardan, Charsadda, Peshawar and Nowshera, Improvement of water supply system in urban areas of merged districts, Construction of public park in Swabi, Establishment of a municipal committee and provision of services in Bara Bazar Khyber, establishment of a Petroleum Technology Institute, Chief Minister’s Skills Development Program
13th and 14th PDWP Meetings Held Respectively on 1st March 2026
Planning and Development Department Khyber Pakhtunkhwa held the thirteenth and fourteenth meetings of the Provincial Development Working Party respectively
32 development projects worth over Rs52 billion approved in the PDWP meeting
Important projects in the education sector approved on the special instructions of Chief Minister Khyber Pakhtunkhwa Muhammad Sohail Khan Afridi
Several important education projects have been approved to improve access to quality education in Khyber Pakhtunkhwa.
Approval of Degree College for Boys in Mansehra City: A degree college will be established in Mansehra City, which will increase access to higher education in the area.
Government Primary School (GPS) and Government Girls Primary School (GGPS) in Yarakhel Marghuz District Swabi: Primary schools for boys and girls have been approved in Yarakhel Marghuz, Swabi, with the aim of improving the infrastructure of basic education.
Revised scheme for establishment of 6 model schools in Khyber Pakhtunkhwa approved
A revised scheme for establishment of 6 model schools in Karak, Haripur, Charsadda, Hangu, Battagram, Bannu was approved and it was directed to be made active as soon as possible so that the students can get its effects as soon as possible.
Thousands of students are expected to benefit from these projects and will play an important role in the development of the education sector of Khyber Pakhtunkhwa.
Underpass approved on the busiest Peshawar Ring Road of the provincial capital
A major development in the development of the capital
The Ring Road Underpass project has been approved. This project is expected to modernize the transport system in the provincial capital, which will ensure uninterrupted travel on the busiest corridor and solve travel problems.
This will not only reduce the travel time but also ensure easy and safe travel for the passengers.
Under the special instructions of Khyber Pakhtunkhwa Chief Minister Muhammad Sohail Afridi, the 14th meeting of the Provincial Development Working Party has approved 18 schemes in the road sector, with a total cost of Rs 17 billion, including 8 feasibility studies. These projects will significantly transform the road infrastructure across the province, improve access to remote areas, ensure safe travel and bring economic prosperity.
On the instructions of Khyber Pakhtunkhwa Chief Minister Muhammad Sohail Afridi, a 26.6-kilometer road project from Lakki to Hakla is a major project.
The 26.6-kilometer long link road project from Lakki to Hakla, costing Rs 6163 million, is a major infrastructure project for the province of Khyber Pakhtunkhwa. The construction of a road from Lakki to Hakla under this project will reduce the travel time in the area and provide safe travel facilities to the people.
The project will also contribute to economic development as it will improve accessibility in the area and increase opportunities for trade and industry. The completion of the project will provide new employment opportunities for the people and will play an important role in the overall development of the province.
The meeting of the Provincial Development Working Party was held under the chairmanship of Additional Chief Secretary Planning and Development Department Khyber Pakhtunkhwa Mr. Islam Zeb
The meeting was attended by PDWP members and officers of the concerned departments. The forum approved 32 important projects related to local government, roads, primary and secondary and higher education for the development of the province.
15th PDWP Meeting Held on 4th of March 2026
The 15th meeting of the Provincial Development Working Party was held in the Planning and Development Department of Khyber Pakhtunkhwa.
On the special instructions of the Chief Minister of Khyber Pakhtunkhwa, Muhammad Sohail Afridi, the PDWP meeting approved 13 development projects worth more than 25 billion.
The meeting of the Provincial Development Working Party was held under the chairmanship of Additional Chief Secretary of the Planning and Development Department of Khyber Pakhtunkhwa, Mr. Islam Zeb.
The meeting was attended by PDWP members and officers of the relevant departments. The forum approved 13 important projects related to tourism, irrigation, roads, food for the development of the province.
The approved projects include the construction of a blacktop road from Ladha to Ghwak (5 km) in South Waziristan and the widening and blacktopping of the road from Sam to Karab Korona Lower Kanigram, improvement, widening and rehabilitation of existing roads and bridges in the merged areas, reconstruction, improvement, widening and rehabilitation of the road from Pir Bala Chowk to Shahgai Thana Chowk Peshawar and construction of roads in various UCs, solarization and rehabilitation of the existing inactive DWSS in Khyber district under the Khyber Pakhtunkhwa Rural Investment and Institutional Cooperation Project, development of camping pod sites and rest houses in Khyber Pakhtunkhwa, construction of a road from Ziara to Daburi Orakzai, standardization and repair and rehabilitation of food grain warehouses in Khyber Pakhtunkhwa, innovative interventions in the food sector, equipping schools with solar energy in the merged areas, construction of 198 km of technically and economically feasible roads in Peshawar division, Badbir Tehsil of Peshawar district And includes feasibility studies and detailed designs of small dams in Hassan Khel.
PDF Committee Meeting Held Under the Chairmanship of ACS KP
Video Link Meeting With Director KFW Mr. Sebastian Jacoby And His Team
A video link meeting was held between Secretary Planning and Development Department Khyber Pakhtunkhwa, Mr. Adeel Shah, and representatives from P&D, along with Director KFW Mr. Sebastian Jacoby and his team. The meeting focused on discussing areas of mutual cooperation. During the meeting, the Secretary directed the team to expedite activities and pursue all initiatives simultaneously to ensure timely execution of projects.
Review Meeting on ADB Portfolio for KP
CM KP Meeting Regarding Upcoming ADP 2026-27
Khyber Pakhtunkhwa Chief Minister Muhammad Sohail Afridi chaired a video link meeting of the Planning and Development Department
Chief Minister Sohail Afridi issued instructions to complete the PC-1 of all schemes included in the upcoming Annual Development Program (ADP) by June. The Annual Development Program 2026-27 will be a roadmap for the all-round development of the province and priority will be given to backward districts.
In new development projects, employment opportunities, education, health and provision of basic amenities will be given top priority so that the people can directly benefit.
The meeting was briefed on the funds and expenditure released under the Annual Development Program 2025-26.
So far, 67 percent of the amount released has been spent, while 218 high-priority projects will be completed during the next financial year.
The federation has not yet released funds for the rapid development program of the merged districts in the current financial year, however, the provincial government has released Rs 29.6 billion.
In the next financial year’s development program, 80 percent of the funds will be allocated for ongoing projects and 20 percent for new projects.
The next development program includes a Roshan Qabas package of Rs 1,000 billion for the merged districts. In addition, proposals for the establishment of Health City, Ehsaas Jungle Program and Tribal Medical College are also part of the program.
Similarly, virtual classrooms, bag-free schools, artificial intelligence curriculum in schools, Tribal University and Integrated Development Package for Upper Chitral have also been included.
Expansion of the shelter network, Zamong Core Network, schools for special children, self-employment project for the disabled, Khyber Safari Train, divisional expansion of BRT, completion of Safe Cities and Cyber Security Operation Center are also part of the next annual development program.
The 9th PSC Meeting of the KPCIP









