A special meeting of Provincial Development Working Party (PDWP) was held under the Chairmanship of Mr. Shakeel Qadir Khan the Additional Chief Secretary P&D Department Khyber Pakhtunkhwa on 7th April, 2021 through video link. The meeting was attended by members of PDWP and concerned department. The forum considered 05 schemes pertaining to Water sector for the uplift of the province. The forum approved/cleared all the schemes with an estimated cost of Rs. 4,225.574 million for inclusion in the PSDP 2021-22.
The details of schemes approved are as under:
Â
The details of schemes approved are as under:
S.# | Sector | Name of Scheme |
1 | Water | Construction of Shahu Khel, Ouch Bazar Gravity Flow Irrigation Scheme in District Hangu |
2 | Water | Construction of Manchura Dam Project District Mansehra |
3 | Water | Construction/Improvement of Canal Patrol Roads, Flood Protection Works and Civil Channels in District Malakand |
4 | Water | Construction/Improvement of New Michni / ICHRI Canal systems along with allies infrastructure Irrigation Patrol Roads and Installation of Solar Based Irrigation Tube Wells at Required Locations in Tehsil Shabqadar District Charsadda |
5 | Water | Construction/Improvement of Canal Infrastructure along with Canal Patrol roads of Lower Swat Canal, Abazai Canal and Drainage Systems and Installation of Solar Based Irrigation Tube Wells at Required Locations in Tehsil Tangi District Charsadda |