17th PDWP Held on 25th February 2021

The 17th meeting of Provincial Development Working Party (PDWP) was held today i.e., 25th February, 2021 under the Chairmanship of Shakeel Qadir Khan the Additional Chief Secretary, P&D Department, Khyber Pakhtunkhwa through video link. The meeting was attended by members of PDWP and concerned government Departments. A total of 33 schemes were presented to the forum, which pertained to various Sectors such as Home, Health, Water, Urban Development, DWSS, Sports/Tourism, E&SE, Higher Education, Roads and Multi Sectoral Development for the uplift of the Province. Out of the said, the forum approved 29 schemes with an estimated cost of Rs. 28616.396 million. On the other hand 04 schemes were deferred due to inadequate design and were returned to the respective Departments for rectification.
The details of schemes approved in the PDWP meeting are as under:-

S#

Sector

Name of Scheme

1.                     

Home

200449- Acquisition of Land for the Establishment of Khyber Pakhtunkhwa Forensic Science Laboratory Peshawar.

2.                     

Health

150522-Establishment of Nowshera Medical College (Phase-I)

3.                     

Water

200377- (2020 – 2021) Construction of Torawari Dam Project District Hangu

4.                     

DWSS

190472-Water Supply Schemes in UCs Kehal, Central Urban, Malikpura, Nawansherhr, Shiekhul Bandi, Kakul, Mirpur, Banda Pir Khan and Cantt area Abbottabad.

5.                     

Sports/Tourism

190088-Holding of Important Tourism Festivals in Khyber Pakhtunkhwa

6.                     

Sports/Tourism

180482-Tourist Facilitation Centers (TFC) and Rest Areas

7.                     

Sports/Tourism

190295-Feasibility studies for Tourism Development Projects.

8.                     

Sports/Tourism

195218-Establishment, upgradation & Rehabilitation of Sports Facilities (AIP) Sub-Scheme: 195218-10-Upgradation/Rehab of Wana Sports Complex, South Waziristan

9.                     

Sports/Tourism

195218-Establishment, upgradation & Rehabilitation of Sports Facilities (AIP) Sub-Scheme: 195218-12-Upgradation and Rehabilitation Kalaya Sports Complex.

10.                  

Sports/Tourism

195218-Establishment, upgradation & Rehabilitation of Sports Facilities (AIP) Sub-Scheme: 195218-2- Upgradation / Rehabilitation of Jamrud Sports Complex.

11.                  

Sports/Tourism

195226-Promotion of Cultural Activities  (AIP)

12.                  

Sports/Tourism

200145-Development of Tourist Spots in Khyber Pakhtunkhwa Sub-Scheme: 200145-11-PC-II, Feasibility Study & Designing for Construction of Dubair Valley road KKH to Jabba Mankial District Swat.

13.                  

Sports/Tourism

200145-Development of Tourist Spots in Khyber Pakhtunkhwa Sub-Scheme:  200145-12- PC-II, Feasibility Study & Designing for Construction of Amlook Dara Baghoona to Nagrai Kacha Road i/c Structures / PCC Work

14.                  

Sports/Tourism

200145- Development of Tourist Spots in Khyber Pakhtunkhwa Sub-Scheme : 200145-13- PC-II, Feasibility Study & Designing for Construction of Access Road at Moori Mall Kolai Palas -District Kohistan

15.                  

Sports/Tourism

160582 – Promotion of Cultural-comunity Activities and sponsorship for National/International Exposures.

16.                  

Sports/Tourism

180562 – F/S and Establishment of Motor Sports Arena in Khyber Pakhtunkhwa

17.                  

H. Edu

195137-Capacity building programme for college faculty (AIP)

18.                  

H. Edu

140589-Establishment of 10 Govt. Colleges in Khyber Pakhtunkhwa. Sub Head Swabi

19.                  

H. Edu

191310 – 160491 – Grand in Aid to HQ 40 Division for Establishment Cadet College at
Sararogha, SWA. (2019-20) [MA]

20.                  

H. Edu

180621 – Establishment of 15 Government Colleges (boys & girls) in Khyber Pakhtunkhwa – (Phase-II) (Cost of land & Boundary Wall+ academic infrastructure) Sub Head: (1) GDC Bagh Dheri Swat (2) GGDC Shamozai Swat (Rs. 280 million)

21.                  

Roads

200328- Connectivity Roads (left over areas) in Merged Districts (AIP)

22.                  

Roads

140972-F/S and BT of 10 Km road from Mera Mada Khel to Godar, Tor Ghar.

23.                  

Roads

150872-Construction of Machai Peek Coor Kalam (Oagi road) District Tor Ghar.

24.                  

Roads

170568-Construction of 2 Km Bypass Road in Barikot District Swat

25.                  

Roads

200252-Construction of Technically & Economically Feasible 100 KMs Roads in Mardan Division.

26.                  

E&SE

140199-Reconstruction of 760 Non-Strategy Earthquake affected schools.

27.                  

E&A

191181-190262 – Construction of MPA Hostel with Dormitories for Allied Staff for Merged Areas at Peshawar. [MA]

28.                  

MSD

191664-070242-Clearance of Contractors’ liabilities, Compensation / Arbitration Awards, Court decretal amounts and escalation in FATA. [MA] Sub Head: 191664-7-Construction of Bridge on Nanuawar Khwar Lower Kurram & Construction of Dogar Nika Ziarat Bridge in Central Kurram

29.                  

MSD

150747 – Establishment of Centralized GIS Facilities.

Highlights:
Downloads:
Press Coverage:

Read More
banner-20th pdwp 14 april 2021

20th PDWP Held on 14th April 2021

The 20th meeting of Provincial Development Working Party (PDWP) was held under the Chairmanship of Mr. Shakeel Qadir Khan, the Additional Chief Secretary P&D Department Khyber Pakhtunkhwa on 14th April, 2021 through video link. The meeting was attended by members of PDWP and concerned departments. The forum considered 40 schemes pertaining to Multi Sectoral Development, Urban Development, Local Government, Home, Water, Higher Education, ST&IT, Roads, Forestry, Agriculture, Energy & Power, Health, DWSS and Sports & Tourism sectors for the uplift of the province. The forum approved 32 schemes with an estimated cost of Rs. 167459.556 million. 18 schemes were cleared for inclusion in the PSDP 2021-22. 08 schemes were deferred due to deficiencies in project documents/PC-I and were returned to the respective department for rectification.
S.# Sector Name of Scheme
1 Multi Sectoral Development Beautification of Various Bazars.
2 Multi Sectoral Development Provision for Contractors Decretal accrued Liabilities, Land Compensation and Uncashed Cheques Sub-Scheme: Mehboob-Ur-Rehhman Tanoli Advocate vs Collector land acquisition and others, Abbottabad etc. Acquisition of land for construction of Havelian Sara-E-Nehmat Khan Road (Rs.1.2728 Million)
3 Multi Sectoral Development Provision for Contractors Decretal accrued Liabilities, Land Compensation and Uncashed Cheques Sub-Scheme: Mehboob-Ur-Rehhman Tanoli Advocate vs Collector land acquisition and others, Abbottabad etc. Acquisition of land for construction of Havelian Sara-E-Nehmat Khan Road (Rs.0.5000 Million)
4 Local Government F/S for Establishment of Park at Peshawar
5 Home Strengthening of counter Terrorism Department in Newly Merged Districts of Khyber Pakhtunkhwa
6 Water Construction of Barwasa Dam Project District Haripur
7 Water Construction of Flood Protection Works in Tehsil Baffa Pakhal District Mansehra (PSDP-2021-22)
8 Water Construction and Flood Protection Works in Tehsil Balakot and Mansehra (PSDP- 2021-22)
9 Water Construction of Flood Protection Works on Kalpani Nullah at Various Vulnerable Locations From Sikandary Village to Sowkai Village District Mardan PSDP (2021-22)
10 Higher Education Establishment of Research incubation and Pharmaceutical/ Nutraceutical/ Cosmeceutical Research Centre for the Commercialization of Academic Research Through Local Farming and Industry at University of Swabi (PSDP 2021-22)
11 Higher Education Women Empowerment and Enhancing Research Culture (PSDP 2021-22)
12 ST&IT Establishment of Pakistan Digital City at Haripur, Khyber Pakhtunkhwa
13 Roads F/S, Detailed Engg and Construction of Matta Bypass Road (5 Km), Swat
14 Roads Construction, Rehabilitation of internal roads of District Mansehra.
15 Roads Construction/Blacktopping/widening and improvement of Mastuj Broghal Pass Road District Upper Chitral
16 Roads Construction of Swabi Bypass Road
17 Roads Construction of Dir Motorway length (29.377 KM)
18 Agriculture Enhancement of Agriculture land productivity through improved soil and water conservation practices in Khyber Pakhtunkhwa
19 Agriculture Strengthening and Development of Seed Potato Cycle in Khyber Pakhtunkhwa
20 Agriculture Establishment of Technical Support Fund for Agribusiness (Horticulture) Development and Diversification through Matching Grant Support to Farmer, Agribusiness Enterprises and other Private Sector Actors in Khyber Pakhtunkhwa
21 Agriculture Community Dairy & Meat Development Program in Khyber Pakhtunkhwa
22 Agriculture Promotion of Agricultural & Horticultural activities in Merged Areas
23 Energy & Power Feasibility, Detail Design and Construction of 500KV Transmission Line from Chitral to Chakdara along with 500/220/132 KV Grid Station at Chitral & Chakdara, for Power Evacuation from Chitral Region
24 Energy & Power Feasibility, Detail Design and Construction of 220KV Transmission Line in the Swat Corridor with 220 KV Grid Station at Kalam (Swat) and Mingora/Chakdara for Power Evacuation from Swat region
25 Energy & Power Construction of Kalkot Barikot Patrak Hydropower 47 MW District Dir Upper, Khyber Pakhtunkhwa, Pakistan
26 Health Revamping of Non-Teaching DHQs across KP. Sub-Scheme : Revamping of Non-Teaching DHQs (Revenue Component) in Khyber Pakhtunkhwa.
27 Health Upgradation of THQ Hospital Bisham from Cat-D to Cat-C Hospital, District Shangla (PC-II approved by PDWP on 08/10/2019)
28 Health Upgradation of 5 BHUs to RHCs on Need Basis, Sub-Scheme: Upgradation of BHU to RHC Zaroobi District Swabi
29 DWSS Solarization of 300 feasible PHED Drinking Water Supply Schemes in Khyber Pakhtunkhwa under PSDP
30 DWSS Solarization of existing Drinking Water supply schemes in District Mohmand
31 Sports & Tourism Development of roads to Tourist areas in Malakand Division
32 Sports & Tourism Construction of Access roads to Tourist areas destination in Hazara Division

Highlights

Press Coverage

Daily Mashriq

Read More
banner-dualization of dilzak road

Dualization of Dalazak Road Peshawar

Development work is underway to make Dilla Zak Road Peshawar bilateral. 5 km road from Ring Road to Grid Station will ease traffic flow.

Read More
banner social protection policy

Meeting on Social Protection Policy

Work on the first social protection policy of Khyber Pakhtunkhwa is in full swing. Additional Chief Secretary Khyber Pakhtunkhwa Shakeel Qadir Khan was briefed on the progress of the policy by the SDU unit of the P&D department.
The main objective of the Social Protection Policy is to improve the living standards of the weak and deserving sections of the province – the policy will set up programs to help the poor and needy.

Read More
banner-reformation of small industries development board

Reformation of the Small Industries Development Board (SIDB)

To reform the Small Industries Development Board (SIDB), the Government of Khyber Pakhtunkhwa has outlined a comprehensive development plan. Entrusted with the promotion and facilitation of small industries in the province, the SIDB has been working under the aegis of the Industries Department to establish training and manufacturing centers for small and cottage industries besides developing small industries estates throughout the province. A meeting for SIDB reforms was held at the Planning and Development Department today to share the findings and recommendations of a diagnostic study regarding SIDB sector reforms. These reforms will be contributing to support cottage and small-scale enterprises in the province through a set of demand-based services including infrastructure support, market intelligence, industrial linkages, capacity building and policy advice to boost economic activity and job creation.

Read More
banner-kp gov decided to divide

KP Government Decided The Division of Health & Agriculture Departments into Two Parts

The Khyber Pakhtunkhwa government has decided in principle to divide these departments into two parts to ensure better management of the health and agriculture and livestock departments and efficient management of their administrative affairs. By increasing the process of providing public services can be improved and their administrative matters can be brought in line with the current requirements.

Chief Minister Khyber Pakhtunkhwa Mahmood Khan, while agreeing in principle with the proposed plan to divide these departments into two separate administrative departments, directed the concerned authorities to submit final proposals in this regard to the Cabinet for formal approval. The Chief Minister directed the concerned authorities to expedite the various reform processes in other provincial departments as well and submit a report on the progress made so far in this regard.

He was presiding over a meeting on Monday to review the ongoing reform process in various provincial departments. The meeting was briefed on various issues and suggestions regarding the division of Health Department and Agriculture and Livestock into two parts.

According to the initial plan, the primary health care sector will be separated from the health department while it is proposed to separate the livestock sector from the agriculture department.

Additional Chief Secretary KP Shakeel Qadir Khan, Secretary Development and Planning Amir Tareen, Principal Secretary to the Chief Minister Shehab Ali Shah and other concerned officials also attended the meeting.

Meanwhile, the Chief Minister was briefed about the preparations for the Annual Development Program for the Fiscal Year 2021-22 and the development projects to be completed during the current financial year. The meeting was informed that at present a total of 836 development projects of various types in the province are in the final stages of completion which will be completed by the end of this financial year. The Chief Minister directed the concerned authorities to start preparations for the next annual development program now and take necessary steps to finalize it in time.

 

 

Read More
SPGM Future Action Plan

Meeting on Future Action Plan of SPGM Section

Establishment of Social Protection and Gender Mainstreaming section at Planning and Development Department Khyber Pakhtunkhwa is one such initiative that the government is embarking upon to achieve gender equality.
A brief presentation by SPGM Section Chief on the future plan of action of the section was given to the Additional Chief Secretary Khyber Pakhtunkhwa Shakeel Qadir Khan today at the P&D Department.

Read More
banner-review-meeting-brt

Review Meeting on BRT Peshawar

A Review meeting was held on BRT in Planning & Development department. The meeting was chaired by Additional Chief Secretary Khyber Pakhtunkhwa Shakeel Qadir Khan. According to the briefing Bus Rapid Transit reaches daily highest ridership record of 182,000. In April 2021, BRT crossed this ridership milestone. The previous highest daily ridership in February was 174,000. The opening of feeder routes is increasing BRT’s ridership. According to the briefing out of 30 more new buses, 26 have reached Peshawar in which installation work is in progress. So far 35% of old buses have been scrapped.

Read More
banner

Steering Committee Meeting on Khyber Institute of Child Health & Children’s Hospital

A steering committee meeting under the chairmanship of Additional Chief Secretary Khyber Pakhtunkhwa Shakeel Qadir Khan was held at the Planning and Development Department of Khyber Pakhtunkhwa to expedite the work on the Khyber Institute of Child Health and Children’s Hospital, Peshawar, which is the first of its kind in the province to treat children.

The Khyber Institute of Child Health and Children’s Hospital is a unique mega project of its kind in the province which has been delayed in the past due to various reasons. The government has expedited the work to complete the project.

The cost of the project is Rs 8 billion. The PC-1 of which has recently been set up in accordance with the requirements of modern times and to ensure the provision of all facilities and equipment for the Children’s Hospital keeping in view the latest technology. It was decided in the meeting that all the required staff would be provided to the hospital six months before the completion of the project.

For the project, at least 10 specialist doctors will be sent on training on scholarships through which a team of pediatric psychologists, pediatric eye specialists, pediatric neurologists, and pediatric nephrologists will be available for services in the province. A plan of action was also approved for the installation and maintenance of the Health Management Information System and equipment for the project. It was also decided in the meeting that the steering committee will closely monitor the progress of the project.

Press Coverage
Daily Mashriq

Read More
banner roads mohmand

Improvement of Roads in Khyber Pakhtunkhwa

Roads play important part in the social and economic development of a country. National integration is not possible without having  proper road networks.  For this purpose KP Government is taking steps to improve roads in various parts of the province including merged districts.

Press Coverage:
Daily Mashriq

Read More