Category: News Archives

this category is created for old news and events
5

Meeting on the Construction of Peshawar D.I Khan Motorway

Significant progress of Khyber Pakhtunkhwa government on Peshawar DI Khan Motorway – Preliminary PC-1 of Peshawar DI Khan Motorway has been prepared. Further examination of the project will be done in the pre-PDWP meeting to be held in P&D department. Later the plan will be presented in the Provincial Development Working Party meeting. In the meeting to be held in P&D department, Additional Chief Secretary Khyber Pakhtunkhwa Shakeel Qadir Khan was given an initial briefing by C&W department. Secretary C&W Khyber Pakhtunkhwa also attended the meeting. The meeting was informed that the total length of Dera Ismail Khan Motorway from Peshawar is 360 km. A total of 19 interchanges have been proposed in the Motorway which will provide convenient transportation  to the people of Peshawar, Kohat, Hangu, Karak, Lakki Marwat, Tank, Bannu and DI Khan.
The motorway will consist of 6 lanes in total. Two unique tunnels of its kind will also be constructed in Peshawar DI Khan Motorway at Dara Adamkhel and Banda Daud Shah. The length of Dara Adamkhel tunnel will be 5.6 km while the Length of Banda Dawood Shah will be 1.6 km. A total of 110 small and large bridges have been proposed in Peshawar DI Khan Motorway. Completion of the project will facilitate access to the southern districts of Khyber Pakhtunkhwa and have a positive economic impact on the region.

Read More
3

Press Release: 11th PDWP Held on 18th November 2020

The 11th meeting of Provincial Development Working Party (PDWP) was held under the Chairmanship of
Mr. Shakeel Qadir Khan, the Additional Chief Secretary P&D Department Khyber Pakhtunkhwa on 18th November, 2020 through video link. The meeting was attended by members of PDWP and concerned departments. The forum considered 61 schemes pertaining to Health, Local Government, MSD, Social Welfare, Water, Industries, Board of Revenue, Estab: & Admin, Roads, DWSS, Sports & Tourism, Urban Development, Finance, Auqaf, E&SE and Higher Education sectors for the uplift of the province. The forum approved 54 schemes with an estimated cost of Rs. 54038.044 million. 1 scheme was cleared by PDWP and was recommended for approval of CDWP. 6 schemes were  deferred due to inadequate designs and was returned to the respective department for rectification.

Approved schemes of Health sector were:
1.    Strengthening of the Rehabilitation Services for Physically Disabled at Health Department Khyber Pakhtunkhwa.
2.    Opening of 18 CHCs in South Waziristan Agency. [MA]
3.    Opening of 41 CHCs/CDs in Mohmand Agency. [MA]
4.    Opening of 20 CHCs/CDs in Khyber Agency. [MA]
5.    Opening of 24 CHCs/CDs in North Waziristan Agency. [MA]
6.    Opening of 15 CHCs/CDs in Orakzai Agency. [MA]
7.    Opening of 11 CHCs/CDs in FR Peshawar. [MA]
8.    Outsourcing of Non-Clinical Services (AIP)
9.    F/S for Establishment of Paraplegic Center in Merged Areas (AIP)
10.    Purchase of equipment and furniture for newly constructed one Hostel, 60 rooms, 2 lecture theaters, Laboratories and auditorium at Saidu Medical College Swat.

Approved schemes of MSD sector were:
11.    Provision for Contractors Decretal accrued Liabilities, Land Compensation and Uncashed Cheques Sub- Scheme: 160453-2 feasibility study of embankment and road along left bank of swat river from ladaki to Bagh Dheri District Swat.
12.    Provision for Contractors Decretal accrued Liabilities, Land Compensation and Uncashed Cheques Sub- Scheme: 160453-3 Construction of Buildings for C&W Department.  
13.    Clearance of Contractors’ liabilities, Compensation / Arbitration Awards, Court decretal amounts and escalation in FATA. [MA] Sub-Scheme: 191664-5 contractor liabilities in respect of the scheme construction/improvement of 10KM approach road to marble City. Mohmand Agency (Part of 14.5 KMs road from Ekkaghund to MMC)
14.    Clearance of Contractors’ liabilities, Compensation / Arbitration Awards, Court decretal amounts and escalation in FATA. [MA]. Sub- Scheme: 191664-6 Upgradation of BHU Sheen Dhand to Type-D Hospital with two specialties in TSD Dara Adam Khel.
15.    FATA Water Resources Development Project (FWRDP). (GoP Component) (ADB Assisted). [MA]. Sub Scheme: 191671-35 Construction of Kat Gala Sub-Project District Bajaur.

Approved schemes of Social Welfare sector were:
16.    Establishment of Comprehensive Rehabilitation Center for PWDs at District D.I.Khan, Swat &  Abbottabad.
17.    Establishment of Center of Excellence for Special Children with Autism in Peshawar.

Approved scheme of Water sector was:
18.    Construction of different canal roads and Overhead bridges/Lining/Pavement of canals/ construction of nullah/water channels/FPW at UCs Urmar Payan, Mera Kachuri, Tarnab, Budhni, Phandu, Chamkani, Mian Gujar and Hindki Daman etc District Peshawar.

Approved scheme of Industries sector was:
19.    FATA Infrastructure Project (FIP-QIPs) (USAID) [DOP] Sub Head: Reconstruction of Government Technical Institute Ghiljoo District Orakzai.

Approved schemes of Board of Revenue sector were:
20.    Construction of District Headquarter of District Upper Chitral.
21.    F/S of District Secretariat, Palas Kohistan.
22.    Settlement and Digitization of Land Record in Merged Districts (AIP)

Approved scheme of Home sector was:
23.    Training Programs for Police and Levies along with necessary equipments (AIP)

Approved scheme of Establishment & Admin sector was:
24.    F/S and detailed designing of Khyber Pakhtunkhwa Residences/Offices for Govt Servants in KP.

Approved schemes of Road sector were:
25.    F/S, Design & Rehabilitation of Mingora Jambeel Gokand road, Swat
26.    Immediate Rehabilitation of flood damaged (09 Nos Roads & Bridges each) due to flash flood and GOLF 2015, District Chitral
27.    F/S & Dualization of Mardan-Swabi Road (ADB Assisted)
28.    Construction of Technically & Economically Feasible 294 KMs Roads in Malakand Division.
29.    Construction of Technically & Economically Feasible 170 KMs Roads in Hazara Division.
30.    Construction of Technically & Economically Feasible 60 KMs Roads in Kohat Division.
31.    Construction of Technically & Economically Feasible 35 KMs Roads in Bannu Division.
32.    Construction of Technically & Economically Feasible 100 KMs Roads in Mardan Division.
33.    Rehabilitation of Main Jamrud Warsak Road to Shahgai Thana (13 Kms) Khyber (ER) (AIP)
34.    Improvement of Okh Kandau- Feroz Khel- Ziara Road (17 Km) (AIP)
35.    Improvement and Rehabilitation of road from Pir Qala to Ghalanai (Balance portion) (14-km) (AIP)
36.    Construction of Technically & Economically Feasible 198 KMs Roads in Peshawar Division.

Approved schemes of DWSS sector were:
37.    Construction/Rehabilitation of Drinking Water Supply Schemes in Newly Merged Districts (AIP)
38.    Rehabilitation and Revitalization of Existing Drinking Water Supply Schemes in Tribal Districts.

Approved schemes of Sports & Tourism sector were:
39.    Standardization and Up-gradation of Sports Complexes at DI Khan, Bannu,Haripur and Mardan (Total Cost Rs. 700 Mn – Phase-I Cost Rs. 300 Mn).
40.    Establishment of Multipurpose International Standards Indoor Gymnasium in, District Buner. (PC-II approved on 17.09.2019)
41.    Construction/Development of Cultural Complexes in Khyber Pakhtunkhwa.
42.    Honouring Living Human Treasures in Khyber Pakhtunkhwa.
43.    Development of Tourist Spots in Khyber Pakhtunkhwa

Approved schemes of Urban Development sector were:
44.    Construction of Footpath, Cattle Fair, Car Parking, Group Latrine,Taxi Stand and Public Park in District Bajaur. (AIP).
45.    Construction of Bus Terminal, Beautification of Urban Areas, Slaughter House, and Family Park in Sub-Division, Dara Adam Khel, Kohat. (AIP).

Approved scheme of Auqaf sector was:
46.    Construction and Rehabilitation of Darul Uloom Haqannia, Akora Khattak

Approved schemes of E&SE sector were:
47.    Solarization of Schools in Merged Areas (AIP)
48.    Reconstruction of ERRA leftover Strategy and Non- Strategy Schools in KP

Approved schemes of Higher Education sector were:
49.    Provision of water supply/Filtration Plants to Govt Colleges of Khyber Pakhtunkhwa
50.    Provision of Land and Construction of Building for existing Government Colleges in Merged Areas (AIP)
51.    Provision of Additional Academic Infrastructure & Missing Facilities in the existing Government Colleges in Merged Areas on need basis (AIP)
52.    Introduction of BS Program in Colleges in all Tribal Districts (AIP)
53.    Purchase of Necessary Items (Furniture, Equipment, Plant & Machinery, Sport Goods, Computer & Allied Accessories, etc.) for Colleges on Need Basis.
54.    Provision of Additional infrastructure and repair of existing colleges.

Read More
Highlights of Various Schemes Approved Under the 11th PDWP

Highlights of Various Schemes Approved Under the 11th PDWP

Various Schemes are approved under 11th PDWP meeting:

Read More
126980319_2891863954379385_7007010175122013767_o

A Meeting Regarding Urban Policy and Planning Unit

Additional Chief Secretary Khyber Pakhtunkhwa chaired a meeting of Urban Policy and Planning Unit, which was aimed at restructuring and reorganization of the Unit. During the meeting work plan for the year 2020-25 were discussed in detail.

Read More
127723604_2898781157020998_3828119911249351575_o

Meeting on Public Private Partnership Powers and Functions Rules 2020

Presentation to the Additional Chief Secretary Khyber Pakhtunkhwa on Public Private Partnership Powers and Functions Rules 2020.
Secretary P&DD, Chief Economist P&DD and Section Chief PPP were also part of the meeting. The meeting discussed way forward to create an enabling environment for public-private partnership by streamlining the project approval process and to provide an effective framework for policy guidelines.

Read More
1

Restructuring of Foreign Aid Section

The Planning and Development Department is in the process of restructuring its Foreign Aid Section to improve coordination with the donor agencies, development organizations and multilateral/bilateral partners. Meeting held today in P&DD.

Read More

Officers Who Spent More Than Two Years On The Same Post Are Transferred

In the light of the decision of the Cabinet, the Department of Planning and Development, Khyber Pakhtunkhwa has issued transfer orders for the transfer of government officials and officers who have been in the same post for more than two years.

1.List One

2.List Two

3.List Three

Read More
Image 1

ACS KP Reviewed Amn o Insaf Programme Today

Additional Chief Secretary Khyber Pakhtunkhwa reviewed Amn o Insaf Programme today at Planning and Development Department Khyber Pakhtunkhwa. Strengthening institutional capacity of the police department, prosecution and courts is a key priority area of the Programme.

Read More
crop reporting mechinism

Meeting on Crop Reporting Mechanism

The Government of Khyber Pakhtunkhwa plans to introduce modern agriculture technologies for accuracy in crop reporting and estimation, as well as improved planning. A project for that purpose will soon be introduced to be implemented by them Agriculture Department. Meeting held under the chairmanship of Additional Chief Secretary Khyber Pakhtunkhwa at P&DD today.

Read More
12th PDWP

12th PDWP Meeting Will be Held on 9th December 2020

12th PDWP meeting will be held on 9th December 2020. Various new schemes will be introduced in the meeting.

Read More
Skip to content